Kane Dalman and the Big Fella Landscapes Crew
Underneath most decking enquiries sits a plainer question: will the crew turn up and finish.
Kane Dalman started Big Fella Landscapes in 2007, and thousands of residential and commercial projects have gone through the team since. Decking is carpentry, and Carpentry is a qualification we hold alongside Landscape Construction and Concreting, so the deck, its steps and any concreting beside it are one job with one crew. That concreting is the same work we do as a concreter in Nar Nar Goon.
Accept the quote and your build gets that crew and a place in the schedule, with Kane the one person you deal with through to handover. It lands on time and on budget and carries a 12-month workmanship guarantee. More of what we build is set out on our decking page.
Boards That Stay Wet, and What That Does Underfoot
A deck on the south side of the house, or under an established tree, holds moisture for weeks at a stretch through winter. Damp boards grow algae and mould, that film turns a deck slippery, and on steps down to the lawn it is how people come off.
Most of the fix is built in rather than applied later: gaps set so water and leaf litter fall through instead of sitting on the bearers, ground graded to drain, frame kept clear of soil so air moves underneath. Where shade is permanent a grooved profile helps, and several composite ranges carry a tested slip rating.
Bushfire Mapping Comes Before the Timber Order
Whether a bushfire attack level applies to your build is decided parcel by parcel, against the Victorian bushfire-prone-area mapping for that address. It is not a suburb-wide answer and it is not safe to assume either way. Resolve it early: a BAL governs which timber species are permitted, how the substructure is detailed, and how the underside is enclosed.
Deck Height and the Building Permit Question
In Victoria a building permit is generally required once a deck’s finished floor level sits more than 800mm above the ground. That is the state-level position, and how it lands on your build is confirmed with Cardinia Shire, the responsible council here, or with a Registered Building Surveyor.
Height is easy to underestimate. A deck level with a back door can clear the mark at its far corner where the ground falls away. We settle the finished height and the engineering at the on-site visit, so any permit step is priced and scheduled from the start.
How Often You Will Be Out There With a Brush
Hardwood wants a wash and a re-oil about once a year to hold its colour, sooner where the deck sits in shade. Once the coating wears through where people walk, it takes a light sand before the next coat. Treated pine runs on a stain at much the same interval. Leave either three or four seasons and the re-coat becomes a full sand back.
Composite wants a wash and little else. No oil, no stain, no sanding. Keep leaf litter out of the gaps and look over the fixings every couple of years.
Why Two Decks the Same Size Get Different Quotes
No square-metre rate survives contact with an actual site. Six things carry most of the number:
- Area, and how much of it is a plain rectangle
- Height off the ground, which drags footings, posts and engineering with it
- Substructure: treated pine, hardwood or steel, and footing depth
- The board on top: composite costs more to buy, less to own
- Stairs and balustrade, which arrive with height and carry the labour
- Access to the back of the block for machinery and materials
The visit and the quote cost nothing, and no design or figure is locked in.
Give Us the Address and We Will Come and Look
Nar Nar Goon and Nar Nar Goon North share the one postcode, 3812, so the street address is what tells us which block to come and stand on. Send it through with a rough size and how far off the ground you are picturing the deck. If the yard around it is changing at the same time, that is the work we do as a landscaper in Nar Nar Goon. Phone Kane Dalman on 0412 881 728 or use the enquiry form, and a time gets set for him to come out, after hours if a weekday will not work.